Description

The work in question is located at “Parque das Nações” in Lisbon and the intervention began by performing a retaining wall composed of 116 panels CSM reinforced with steel sections IPE associated with two levels of pre-stressed anchors and indirect foundations using jet-grouting columns of diameters Ø600mm, Ø800mm and Ø1200mm armed with GEWI bars.

Project Owner

Groupe SANA

Location

Lisbon, Portugal

Special Works

  • 1190 m³ Cutter Soil Mixing
  • 3660 ml anchors 600 kN
  • 967 m³ Jet-grouting armed