May Flower Building
Description
The project, located on the street corner "Boulevard Maréchal Foch" with "Avenue Général Maizière" in Antibes, it is about an excavation of about 11 meters. The retaining wall was accomplished through soil-cement panels performed with the Cutter Soil Mixing technology and four levels of tubular steel struts, and in two levels were applied prestressing.
Project Owners
SARL FOCH
Franco Hollandaise Construction
Location
Antibes, France
Special Works
- Final Design
- Cutter Soil Mixing
- Pre-stressed Struts
- Instrumentation and Monitoring