Description

The project, located on the "Avenue Mirabeau" at Antibes, It is about the construction of a building with three underground floors. The excavation of about 9 meters was achieved with a peripheral retaining wall through soil cement panels performed with the Cutter Soil Mixing technology and two levels of tubular metal struts.

Project Owners

SARL Mirabeau
Franco Hollandaise

Location

Antibes, France

Special Works

  • Final design
  • Cutter Soil Mixing
  • Internal bracing by metal tubes
  • Instrumentation and monitoring

Other Projects